Download PDFOpen PDF in browserProductivity Improvement Using Motion Study & Work Measurement in Permanent Magnet DC (PMDC) Motor8 pages•Published: August 5, 2017AbstractIn manufacturing sector, production time is an important factor in order to compete in market. This leads every management to decrease production time and increase quality of the product. In manufacturing industry in the production of product the main two kind of time consumption are Machining time and travel time also known as value added and non-value added time. Sometimes unnecessary or improper work cycle leads to delay in manufacturing. Hence, it is most important to identify that delay and minimize for positive benefit of company. As most of the industries bear losses due to nonproductive time in the manufacturing cycle and this paper give one of many solutions to increase the productive time. The main objective of this paper is to explain how the plant layout can with help of Motion study and Work Measurement to reduce lead-time and the manufacturing cycle time.Keyphrases: motion study, productivity improvement, work measurement In: Ajitkumar Shukla, J. M. Patel, P. D. Solanki, K. B. Judal, R. K. Shukla, R. A. Thakkar, N. P. Gajjar, N. J. Kothari, Sukanta Saha, S. K. Joshi, Sanjay R. Joshi, Pranav Darji, Sanjay Dambhare, Bhupendra R. Parekh, P. M. George, Amit M. Trivedi, T. D. Pawar, Mehul B. Shah, Vinay J. Patel, Mehfuza S. Holia, Rashesh P. Mehta, Jagdish M. Rathod, Bhargav C. Goradiya and Dharita K. Patel (editors). ICRISET2017. International Conference on Research and Innovations in Science, Engineering and Technology. Selected Papers in Engineering, vol 1, pages 340-347.
|