Download PDFOpen PDF in browser

Assessment of Solar Rooftop Power Plant-a Case Study

EasyChair Preprint no. 3264

3 pagesDate: April 26, 2020

Abstract

In this project, We are doing the assessment of the rooftop solar power plant that is present in our college rooftop, that is KIET group of institutions has established 100 kWp capacity grid-connected solar photovoltaic power plant on the rooftop of the E-block, KIET Muradnagar campus, Ghaziabad . The plant was fully commissioned on 2 August 2016. With the motive of green campus, management of KIET group of institutions is looking forward for installation of Solar Power Plant with larger capacity to cater complete KIET campus. Hence, it is essential to document the performance of the first grid-connected solar power plant installed in KIET. In this report, the performance of the photovoltaic solar power plant in KIET during 1June 2017 to 16 June 2018 has been discussed.

Keyphrases: assessment, power plant, rooftop, Solar

BibTeX entry
BibTeX does not have the right entry for preprints. This is a hack for producing the correct reference:
@Booklet{EasyChair:3264,
  author = {Shivam Saxena and Ashish D. Thombre and Yogesh Kumar},
  title = {Assessment of Solar Rooftop Power Plant-a Case Study},
  howpublished = {EasyChair Preprint no. 3264},

  year = {EasyChair, 2020}}
Download PDFOpen PDF in browser