Selection of the Most Proper Progress Payment and Approximate Cost Package Program by DEMATEL Method

EasyChair Preprint 3957

6 pagesDate: July 27, 2020

Abstract

In construction, a progress payment is a partial payment that covers the amount of work completed by a contractor who has undertaken to carry out construction work.  Since construction projects are time-consuming and completed in high budgets, Step by step payment of the works undertaken by the Contractor keeps the owner on the safe side. In the construction sector, progress payments and approximate cost calculations can be prepared faster by package programs. The choice of package programs which perform similar calculations in the market is a multi-criteria decision-making problem. In this study, the most appropriate package selection problem is solved by using DEMATEL method, which determines the interaction between the variables that affect the decision in the multi criteria decision making environment.

Keyphrases: Construction Management, DEMATEL, Multi-criteria decision making

BibTeX entry
BibTeX does not have the right entry for preprints. This is a hack for producing the correct reference:
@booklet{EasyChair:3957,
  author    = {Murat Anbarcı and Burak Öz},
  title     = {Selection of the Most Proper Progress Payment and Approximate Cost Package Program by DEMATEL Method},
  howpublished = {EasyChair Preprint 3957},
  year      = {EasyChair, 2020}}
Download PDFOpen PDF in browser