Abstract

In the present study, a cost analyzed in terms of exergoeconomıc of coal fired power plant. Power plant; It consists of fuel boiler, turbine, electric generator and condensing systems. The total investment rate cost of the plant is consists of fuel boiler (ĠA), turbine (ĠB), electricity generator (ĠC) and condensation unit (ĠD) systems. The energy unit costs of the plant systems; economic life span (ny) annual working time (t) and interest rate (IR) were examined for different parametric values. Boiler unit cost (c2), turbine output and generator unit costs (c3), unit cost per unit energy according to equality method and extraction method were expressed as cşfeq, celeq, cşfex, celex respectively. As a result: Per unit costs decrease although economic life and annual working time (t) increase, per unit costs are increasing as interest rate (IR) increases. Knowing the system costs in advance will create more economical facilities. It will provide an increase in economic efficiency.

Keyphrases: 1'Exergy analysis', 2'Rancine cycle', 3'Steam power plant', 4'Exergoeconomıc', 4'power plant'

BibTeX entry
BibTeX does not have the right entry for preprints. This is a hack for producing the correct reference:
@booklet{EasyChair:14458,
  author    = {Murat Kaya},
  title     = {Exergoeconomic Assessment of Coal-Fired Power},
  howpublished = {EasyChair Preprint 14458},
  year      = {EasyChair, 2024}}
Download PDFOpen PDF in browser