Download PDFOpen PDF in browserReduce Time Overrun of High-Rise Building Projects in Vadodara City Using RII MethodEasyChair Preprint 118744 pages•Date: January 29, 2024AbstractA common problem in construction projects is time overruns. It depends on the project's size and type. This paper focuses on the classification and identification of time overrun factors in High-building projects in Vadodara city. A total of 66 factors of delay were identified under 9 different categories. Then a questionnaire survey is done to find the major causes of delay faced by owner, Contractor, Designer, Consultant, material, labour, equipment, project, and external. From the analysis of the questionnaire major causes of delay were identified with the help of Relative Important Index (RII) method. Keyphrases: Factors of time overrun, RII method, Time overrun, quantitative method, time management
|